
Madrid
Living Lab Madrid (2023 - 2025)
The main objective is to achieve the Energy Positive building status for residential and commercial buildings, and to foster a strategy to ensure that MNN (Madrid Nuevo Norte) becomes a neutral district.
-
Development of 4th generation renewable district heating and cooling
-
Covering of the district's thermal demand through geothermic energy
-
Using local green renewable system to generate electricity
-
Take advance of digital twins to enhance sustainability at district scale
-
Facilitate the development of DHC network in the rest of MNN

Madrid Large Scale District Renovation

LIVING LAB MADRID SCOPE EXECUTED
• ACCIONA in charge of construction of geothermal infrastructure (DHC) its digitalization and operation, performance of full monitoring.
• DCN Selectin of maturing E3 and E4 technologies, permission execution, construction of the pilot building
• IDOM Design period and integration with the urbanization project
ACCIONA Establishment of Local Innovation Cluster GBN (DHC included